Macau Rio Hotel Environment Control System SCADA System Migration Works

Detailed Information

  • Construction Date

    2006

  • Category

    Chiller Plant

This project aims to design a control system for Macau Rio Hotel’s air conditioning ventilation system, with requirements to provide safety logic controls and critical alarm reporting. While temperature and humidity monitoring is achieved using graphical control, environment control system on chiller plant such as EAF, FAF, AHU, PAU system.

The system includes the monitoring of air conditioning unit, fan, temperature sensor. The graphic interface design is based on the client’s requirements and a close-loop control concept is adopted to monitor air quality and maintain a comfortable temperature for the environment.