Shanghai Changning Refuse Transfer Station Automated Refuse Collection System

Detailed Information

  • Construction Date

    2010

  • Category

    ARCS

Use the most efficient method and more labor saving to handle the refuse collection. Since the area is too large, a number of remote panel need to be installed, that makes the project time longer.

Use graphical control in this industry almost the first one in China. A number of challenges such as wide area, air quality, humidity make it difficult to install such a high technology control system. Uses of reliable quality equipment will decrease the break down time of the operations.